berniemax17@gmail.com

berniemax17@gmail.com

  • Home
  • Instructional Design
  • Testimonials
  • Voice Talent
  • Technical Writing
  • MS Access Development
  • My Resume
  • Our Home in Bloomington
    • Phase 1 upgrades, 2011
    • Phase 2 upgrades, 2012
    • Phase 3 upgrades, 2013
    • Phase 4 upgrades, 2014
  • Our Home in Lake Villa
    • Year 1 Upgrades (2021)
    • Year 2 Upgrades (2022)
    • Year 3 Upgrades (2023)
    • Year 4 Upgrades (2024)
    • Year 5 Upgrades (2025)

Year 2 (2022) upgrades, the patio and wall

In 2022, we took on a very ambitious  project of building a sitting wall with a patio in the front of the house. This is what the house looked like before we did any work on the front.

Year 2 (2022) upgrades, the primary front garden

If you recall, the house had a row of red blocks, separating the mulch area from the grass. The first thing I did here was to dig them up, then bury them back in the ground, so they were flush with the grass. I then added another row of gray/white blocks on top so they somewhat matched the color of the wall.

Year 2 (2022) upgrades, the "real" flagpole

Having done all these upgrades, we felt the cheesy flagpole made with shower curtain rods just didn't do the yard justice. So I bought a real 25' flagpole. We dug down about 18 inches below grade and about 16 inches wide. We used a box lined with plastic to form the concrete.

  • Home
  • Instructional Design
  • Testimonials
  • Voice Talent
  • Technical Writing
  • MS Access Development
  • My Resume

Copyright © 2025 Bernie's Personal Information - All Rights Reserved.

Powered by